DPWH Kicks Off 4-Month Repair of ‘Swaying’ Biliran Bridge

Biliran: The Department of Public Works and Highways (DPWH) has started the PHP28.9-million repair of Biliran Bridge, more than a month after the structure went viral online when it exhibited wavelike movements. The DPWH Biliran district engineering office said works started this week following the issuance of the notice to proceed early this month.

According to Philippines News Agency, the identified contractor has been mobilizing their equipment and some materials to be used as scaffoldings and other preparatory repair activities, as stated by DPWH Biliran officer in charge Irwin Antonio in a statement on Thursday. The project involves replacing corroded bolts, steel members, and plates, installing new finger-type expansion joints, and repairing other damaged bridge components.

While construction is ongoing, the bridge will remain open to light vehicles (five tons or below), while heavier trucks are being transported via a barge provided by the provincial government. Built in 1976, the Biliran Bridge serves as a vital and the only connection that people of Biliran may use via land travel to directly cross to mainland Leyte province.

Since December 23, 2024, only light vehicles, including passenger vans and sports utility vehicles, are allowed to cross the bridge. This was after a video showing that the bridge was swaying due to defective components went viral on social media.