Manila:Elevators at the EDSA Busway stations in Guadalupe, Makati, and Philam and Kamuning, Quezon City are back in operation after being inactive for four months, with repairs scheduled at three additional stations within two weeks.
According to Philippines News Agency, Department of Transportation (DOTr) Secretary Vince Dizon announced during an inspection at the Guadalupe Station that the repairs align with President Ferdinand Marcos Jr.'s directive to enhance accessibility at busway stations.
The elevators at Balintawak in Quezon City, and Monumento and Bagong Barrio stations in Caloocan City are anticipated to be operational within the next two weeks. Secretary Dizon has directed the maintenance operator to adhere to a 24 to 48-hour repair timeframe for any future elevator breakdowns and instructed the removal of debris obstructing elevator sensors to minimize downtime.
Security measures at the stations have been tightened to prevent theft, specifically of supply wires, which have contributed to previous damages and delays. The recent inspection was prompted by a passenger's complaint during Dizon's visit to the station on November 2.
During this visit, Dizon emphasized the government's commitment to prioritizing accessibility for senior citizens, persons with disabilities, and expectant women at the Busway stations. He highlighted the significant number of commuters and pedestrians compared to those traveling by car, underscoring the importance of public transportation accessibility.